Road Repair Project Update 5-9-14
Kerns has begun the road grading project on East Lake Drive. They are working from the Cobb Community Center to the north. They are doing this in 4 zones and only disturbing a few hundred feet at a time in any zone.
ZONE 1: COBB CC to approx. Lot 6 (Kostka)
ZONE 2: Lot 6 to Lot 1 (East Boat Ramp)
ZONE 3: Lot 1/200 to approx. Lot 208 (Sherwin)
ZONE 4: Lot 208 to the Levee
While road grading is continuing, storm sewer installation along the north side of the East Boat Ramp is scheduled to be completed by Friday, May 16.
During the road grading phase and working from north to south while in ZONES 4, 3 and to some extent 2, drainage and storm sewer work will continue to completion.
Following this work, smaller rock will be placed on East Lake Drive and smoothed out in preparation of the Road Restoration and Chip Seal project slated for June and July.
Road Repair of East Lake Drive is scheduled to be completed past ZONE 4 by approximately June 1
Construction on grading West Shore Drive is to begin approximately May 20.
Kerns’ work is scheduled to be completed by early June
Asphalt Repair. Old Castle Materials Midwest Co. d/b/a/ Omni Engineering of Omaha, NE will be making repairs to the section of the asphalt road damaged during the flood fight and restoration efforts. This includes repair to the cuts through West Shore Drive near the Caretaker’s home.
Work is scheduled to be completed in June 2014.
Chip Seal. Sta-Built Construction of Harlan, IA will be stabilizing the road base on East Lake Drive, West Shore Drive and Bull Frog Bay Drive. Upon stabilization of the road base a seal coat surface will be applied to all roads including Mid Lake Drive. The seal coat surface incudes the application of asphaltic cement and loose rock. Some tracking of the loose stone is expected in this process.
Work is scheduled to be begin on or before June 15, 2014 and be completed by July 31, 2014.
No work is allowed on July 3, 2014 through July 6, 2014 and the road will be in a passable condition for passenger vehicles during the period of July 3 through July 6, 2014. Chip seal surfacing will not be applied until July 7, 2014. Weekend and night work is allowed with the exception of the days listed
Kerns has begun the road grading project on East Lake Drive. They are working from the Cobb Community Center to the north. They are doing this in 4 zones and only disturbing a few hundred feet at a time in any zone.
ZONE 1: COBB CC to approx. Lot 6 (Kostka)
ZONE 2: Lot 6 to Lot 1 (East Boat Ramp)
ZONE 3: Lot 1/200 to approx. Lot 208 (Sherwin)
ZONE 4: Lot 208 to the Levee
While road grading is continuing, storm sewer installation along the north side of the East Boat Ramp is scheduled to be completed by Friday, May 16.
During the road grading phase and working from north to south while in ZONES 4, 3 and to some extent 2, drainage and storm sewer work will continue to completion.
Following this work, smaller rock will be placed on East Lake Drive and smoothed out in preparation of the Road Restoration and Chip Seal project slated for June and July.
Road Repair of East Lake Drive is scheduled to be completed past ZONE 4 by approximately June 1
Construction on grading West Shore Drive is to begin approximately May 20.
Kerns’ work is scheduled to be completed by early June
Asphalt Repair. Old Castle Materials Midwest Co. d/b/a/ Omni Engineering of Omaha, NE will be making repairs to the section of the asphalt road damaged during the flood fight and restoration efforts. This includes repair to the cuts through West Shore Drive near the Caretaker’s home.
Work is scheduled to be completed in June 2014.
Chip Seal. Sta-Built Construction of Harlan, IA will be stabilizing the road base on East Lake Drive, West Shore Drive and Bull Frog Bay Drive. Upon stabilization of the road base a seal coat surface will be applied to all roads including Mid Lake Drive. The seal coat surface incudes the application of asphaltic cement and loose rock. Some tracking of the loose stone is expected in this process.
Work is scheduled to be begin on or before June 15, 2014 and be completed by July 31, 2014.
No work is allowed on July 3, 2014 through July 6, 2014 and the road will be in a passable condition for passenger vehicles during the period of July 3 through July 6, 2014. Chip seal surfacing will not be applied until July 7, 2014. Weekend and night work is allowed with the exception of the days listed