Road Repair Project Update 7-14-2014
Request Assistance from all Residence. If possible limit parking and or driving on the newly seeded and matted areas adjacent to roadways. If necessity for guests or residents to park in these areas try to utilize the open spaces between the flagging and park in the area where there is established grass. Please note the parking lot east of the playground has been enlarged southerly toward the Community Building allowing spaces for an additional 18 vehicles. (Thank you for your efforts during the 4th of July Holiday as very few areas were damaged.)
East Lake Drive. Cleanup work and adjustment of the inlets is expected to be completed the week of July 14, 2014 by Kerns Excavating.
West Shore Drive. Punch List items are expected to be completed the week of July 14, 2014 on West Shore Drive by Kerns Excavating.
Asphalt Repair. Old Castle Materials Midwest Co. d/b/a/ Omni Engineering of Omaha, NE will be making repairs to the section of the asphalt road damaged during the flood fight and restoration efforts. The steel plates will remain in place through the summer to allow for emergency pumping. An asphalt ramp will be constructed at the steel plates and the other trenches in filled. Anticipated start date is to be July 21, 2014.
Work is scheduled to be completed in July 2014.
Chip Seal. Sta-Built Construction of Harlan, IA will be stabilizing the road base on East Lake Drive, West Shore Drive and Bull Frog Bay Drive. Upon stabilization of the road base a seal coat surface will be applied to all roads including Mid Lake Drive. The seal coat surface incudes the application of asphaltic cement and loose rock. Some tracking of the loose stone is expected in this process. Weekend and night work is allowed. We will be obtaining a detailed schedule the week of July 21, 2014. During this work, access to all properties will be maintained except when they are directly in front of a particular drive. Bull Frog Bay and Midlake Drive are to be done during weekdays.
Work is scheduled to be begin on or before July 28, 2014 and be completed by August 8, 2014. The contractor has been given permission to work 7 days/week if needed.
Request Assistance from all Residence. If possible limit parking and or driving on the newly seeded and matted areas adjacent to roadways. If necessity for guests or residents to park in these areas try to utilize the open spaces between the flagging and park in the area where there is established grass. Please note the parking lot east of the playground has been enlarged southerly toward the Community Building allowing spaces for an additional 18 vehicles. (Thank you for your efforts during the 4th of July Holiday as very few areas were damaged.)
East Lake Drive. Cleanup work and adjustment of the inlets is expected to be completed the week of July 14, 2014 by Kerns Excavating.
West Shore Drive. Punch List items are expected to be completed the week of July 14, 2014 on West Shore Drive by Kerns Excavating.
Asphalt Repair. Old Castle Materials Midwest Co. d/b/a/ Omni Engineering of Omaha, NE will be making repairs to the section of the asphalt road damaged during the flood fight and restoration efforts. The steel plates will remain in place through the summer to allow for emergency pumping. An asphalt ramp will be constructed at the steel plates and the other trenches in filled. Anticipated start date is to be July 21, 2014.
Work is scheduled to be completed in July 2014.
Chip Seal. Sta-Built Construction of Harlan, IA will be stabilizing the road base on East Lake Drive, West Shore Drive and Bull Frog Bay Drive. Upon stabilization of the road base a seal coat surface will be applied to all roads including Mid Lake Drive. The seal coat surface incudes the application of asphaltic cement and loose rock. Some tracking of the loose stone is expected in this process. Weekend and night work is allowed. We will be obtaining a detailed schedule the week of July 21, 2014. During this work, access to all properties will be maintained except when they are directly in front of a particular drive. Bull Frog Bay and Midlake Drive are to be done during weekdays.
Work is scheduled to be begin on or before July 28, 2014 and be completed by August 8, 2014. The contractor has been given permission to work 7 days/week if needed.